Apr 29, 2020
Dynamat
- (0.5 hour)
Category: Fuselage
Installed 1.5 square feet of Dynamat to the inside of the belly skin, just aft of the elevator bellcrank. (I have heard this cuts down on possible oil-canning although I wouldn't think that will be much of a problem in the narrow RV-8 fuselage.)